Data Centre Build

Rear of a data center rack built by Stark Technology, cabling routed and labelled

We build data centres. We do not rent you space in one.

Stark Technology does not own a data centre and does not sell colocation. We are the contractor that turns an empty white space into a working room — racks positioned and secured, compute and storage racked and stacked, structured cabling and fibre trunks pulled and dressed, containment built, every port labelled, and the whole thing tested and handed over with documentation you can actually use two years later.

We have done it for a national data centre, for high-performance computing and GPU clusters, and for enterprise server rooms across Egypt.

Request a site assessment
10Years in operation
50+Team members
40+Projects delivered
25+Clients
Empty racks at the start of a data center build by Stark Technology
Build stage
Dressed and labelled rear cabling at handover
Handover

What we install

Racks and containmentCabinets positioned and secured; cable containment, trays and baskets.
Compute and storageServers, storage and network hardware racked, cabled and powered.
Structured cablingCopper and fibre trunks, patch panels, dressing and cable management.
Rack powerPDUs installed and patched to the A and B feeds provided, every outlet mapped and documented.
Labelling and documentationEvery cable, port and unit labelled to a scheme, with an as-built record.
Testing and handoverVerified, documented as-built, and supported afterwards if you want us to.

Why the back of the rack decides what the next five years cost you

Anyone can rack a server. The difference shows up at the back, and it shows up late.

A rack built properly has two power feeds from two sources to every device, a dedicated management port on every server so it can be reached without anyone driving to site, and cabling routed and labelled so an engineer finds the right one in thirty seconds. A rack built badly looks identical on day one. The difference appears the first night something fails, and then again every time somebody has to add, move or change anything — which, over a five-year life, is where most of the real cost of a facility quietly goes.

Dual power supplies fed from two sources on every server in the rack
Two feeds, two sources, on every device
Dedicated out-of-band management port patched on every server
A management port on every server
Routed, dressed and labelled cabling at the rear of a data center rack
Routed, dressed, labelled

Work we have delivered

We do not identify clients on project work — the sector, not the name.

  • National data centre — Government and defence sector.Full physical build and supervised deployment.
  • Geoscience HPC cluster — Oil and gas sector.
  • HPC and GPU clusters — Research and energy sector.
  • Structured cabling remediation — Multi-sector.Taking an estate that grew without a plan and making it maintainable.
  • Campus core and edge network — Multi-building campus.

See all our projects →

And we are still there after handover

Most contractors hand over the keys and disappear. We run managed IT across Egypt with engineers resident in Cairo, Alexandria and Assiut, so the team that built your facility can be the team that keeps it running — under a written service agreement, with response times in the contract rather than in a brochure. You are not obliged to take it. It is simply available, and it is the reason our builds get looked after properly.

The hardware we install comes from the vendors on our partners page.

Questions we get asked

Do you build the data center itself, or only the IT inside it?
We deliver the IT fit-out — racks, containment, cabling, hardware, labelling and commissioning. The building shell, generators and cooling plant are specialist trades, and we work alongside them rather than pretending to replace them.
Will you work as a subcontractor to a main contractor or consultant?
Yes. A large share of this work reaches us that way.
How small a project will you take?
A single comms room is worth doing properly. We build those as well as halls.
Where do you work?
Egypt-wide, with offices and resident engineers in Cairo, Alexandria and Assiut.
Can you take over a build somebody else started?
Yes, and we would want to survey it first and tell you honestly what we found.

Send us the drawings, or send us the room

If you have a facility being designed, we will review the IT fit-out scope and tell you what we would do differently — no charge and no obligation. If you already have a room that has grown out of control, we will come and look at it and give you an honest written assessment of what it would take to make it maintainable.

Request a site assessment

Or call +20 2 3537 5791